ITAC Assessment: OK0801
ITAC logo
ITAC Assessment: OK0801
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Aerospace parts
NAICS 336411: Aircraft Manufacturing
SIC 3721: Aircraft
Sales Range $10
M
to 50
M
# of Employees 116
Plant Area 100,000
ft2
Annual Production 103,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,163 3,119,209
kWh
Electricity Demand $57,917 7,796
kW-mo/yr
Natural Gas $11,091 1,022
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,326 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,999

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.7492: Use proper thickness of insulation on building envelope $6,511 $78,169 $386
7,906
kWh
- $6,125
-
MMBtu
02 2.7232: Replace existing hvac unit with high efficiency model $4,599 $34,948 $4,599
94,232
kWh
- -
03 2.7211: Clean and maintain refrigerant condensers and towers $9,699 $3,000 $9,699
198,744
kWh
- -
04 2.7232: Replace existing hvac unit with high efficiency model $995 $2,625 - - $995
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,205 $660 $3,205
72,976
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $523 $516 $523
10,726
kWh
- -
07 2.2437: Recover waste heat from equipment $3,015 $2,017 - - $3,015
-
MMBtu
08 2.7135: Install occupancy sensors $547 $1,658 $547
11,212
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $299 $201 $299
6,132
kWh
- -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,069 $14,336 $7,069
144,853
kWh
- -
11 2.3212: Optimize plant power factor $669 $9,307 - $669 -
12 2.2691: Shut off cooling if cold outside air will cool process $4,196 $21,075 $4,196
85,978
kWh
- -
TOTAL RECOMMENDED $41,326 $168,512 $30,523
632,759
kWh
$669 $10,135
-
MMBtu
TOTAL IMPLEMENTED $25,999 $139,817 $18,880
386,860
kWh
- $7,120
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs