ITAC Assessment: HO0196
ITAC logo
ITAC Assessment: HO0196
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Injection Molded Plastics
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 140
Plant Area 40,000
ft2
Annual Production 2,200,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,648 1,818,288
kWh
Electricity Demand $42,392 4,712
kW-mo/yr
Electricity Fees $13,924 -
Natural Gas $14,883 2,521
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,190 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,385 $2,237 $1,083
16,999
kWh
$302
-
kW-mo/yr
- - - -
02 2.7496: Install partitions to reduce size of conditioned space $4,659 $5,000 - - $4,659
-
MMBtu
- - -
03 4.611: Begin a practice of predictive / preventative maintenance $2,000 $500 - - - - - $2,000
04 4.111: Add equipment/ operators to reduce production bottleneck $1,170 $1,000 - - - - - $1,170
05 4.611: Begin a practice of predictive / preventative maintenance $3,000 $300 - - - - - $3,000
06 4.424: Improve space comfort conditioning $2,340 $5,000 - - - - - $2,340
07 3.7131: Use a rag recycle service $336 $200 - - - - $336 -
08 3.4151: Minimize water usage $300 $250 - - - $300
-
Tgal
- -
TOTAL RECOMMENDED $15,190 $14,487 $1,083
16,999
kWh
$302
-
kW-mo/yr
$4,659
-
MMBtu
$300
-
Tgal
$336 $8,510
TOTAL IMPLEMENTED $5,000 $800 - - - - - $5,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs