ITAC Assessment: HO0134
ITAC logo
ITAC Assessment: HO0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Tailored Men's Suits
NAICS
n/a
SIC 2311: Men's and Boys' Suits, Coats, and Overcoats
Sales Range $5
M
to 10
M
# of Employees 168
Plant Area 30,000
ft2
Annual Production 35,250
pieces
Production Hrs. Annual 2,585
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,761 283,118
kWh
Electricity Demand $30,163 1,390
kW-mo/yr
Electricity Fees $2,905 -
Natural Gas $15,359 2,459
MMBtu
Fuel Oil #2 $9,752 1,191
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,577 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,094

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,878 $13,555 $1,534
23,154
kWh
$2,344
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $69 $255 $69
1,172
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $75 $200 $75
1,172
kWh
- - -
04 2.2437: Recover waste heat from equipment $530 $333 - - $530
-
MMBtu
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,333 - - $8,333
-
kW-mo/yr
- -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $1,692 $100 - - - $1,692
-
lb
TOTAL RECOMMENDED $14,577 $14,443 $1,678
25,498
kWh
$10,677
-
kW-mo/yr
$530
-
MMBtu
$1,692
-
lb
TOTAL IMPLEMENTED $10,094 $355 $69
1,172
kWh
$8,333
-
kW-mo/yr
- $1,692
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs