Assessment Year | 2010 |
---|---|
Principal Product | Skid steers and compact loaders |
NAICS | 333120: Construction Machinery Manufacturing |
SIC | 3531: Construction Machinery and Equipment |
Sales Range | greater than $500 M |
# of Employees | 350 |
Plant Area |
500,000
ft2
|
Annual Production | 10,000
pieces
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $681,667 | 13,039,371 |
kWh
|
$0.052 |
Natural Gas | $841,915 | 91,994 |
MMBtu
|
$9.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $189,110 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1116: Improve combustion control capability | $58,238 | $1,003 | - |
$58,238
-
MMBtu
|
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $4,629 | $21,300 | - |
$4,629
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,065 | $9,879 |
$1,065
20,475
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,109 | $19,184 |
$2,109
40,567
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,663 | $226,451 |
$20,663
397,368
kWh
|
- | |
06 | 2.7243: Improve air circulation with destratification fans / other methods | $31,971 | $54,000 | - |
$31,971
-
MMBtu
|
|
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $23,972 | $29,894 | - |
$23,972
-
MMBtu
|
|
08 | 2.7224: Reduce space conditioning during non-working hours | $12,490 | $8,730 | - |
$12,490
-
MMBtu
|
|
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,489 | $24,789 |
$6,489
124,791
kWh
|
- | |
10 | 2.7492: Use proper thickness of insulation on building envelope | $22,062 | $351,000 | - |
$22,062
-
MMBtu
|
|
11 | 2.2511: Insulate bare equipment | $1,902 | $1,801 | - |
$1,902
-
MMBtu
|
|
12 | 2.2511: Insulate bare equipment | $623 | $1,230 | - |
$623
-
MMBtu
|
|
13 | 2.4221: Install compressor air intakes in coolest locations | $2,897 | $435 |
$2,897
55,714
kWh
|
- | |
TOTAL RECOMMENDED | $189,110 | $749,696 |
$33,223
638,915
kWh
|
$155,887
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs