ITAC Assessment: OK0799
ITAC logo
ITAC Assessment: OK0799
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Skid steers and compact loaders
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range greater than $500
M
# of Employees 350
Plant Area 500,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $681,667 13,039,371
kWh
Natural Gas $841,915 91,994
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $189,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1116: Improve combustion control capability $58,238 $1,003 - $58,238
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $4,629 $21,300 - $4,629
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,065 $9,879 $1,065
20,475
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,109 $19,184 $2,109
40,567
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $20,663 $226,451 $20,663
397,368
kWh
-
06 2.7243: Improve air circulation with destratification fans / other methods $31,971 $54,000 - $31,971
-
MMBtu
07 2.7447: Install vinyl strip / high speed / air curtain doors $23,972 $29,894 - $23,972
-
MMBtu
08 2.7224: Reduce space conditioning during non-working hours $12,490 $8,730 - $12,490
-
MMBtu
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,489 $24,789 $6,489
124,791
kWh
-
10 2.7492: Use proper thickness of insulation on building envelope $22,062 $351,000 - $22,062
-
MMBtu
11 2.2511: Insulate bare equipment $1,902 $1,801 - $1,902
-
MMBtu
12 2.2511: Insulate bare equipment $623 $1,230 - $623
-
MMBtu
13 2.4221: Install compressor air intakes in coolest locations $2,897 $435 $2,897
55,714
kWh
-
TOTAL RECOMMENDED $189,110 $749,696 $33,223
638,915
kWh
$155,887
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs