ITAC Assessment: DS0131
ITAC logo
ITAC Assessment: DS0131
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Surface Analysis Equipment
NAICS
n/a
SIC 3826: Laboratory Analytical Instruments
Sales Range $50
M
to 100
M
# of Employees 330
Plant Area 206,000
ft2
Annual Production 75
pieces
Production Hrs. Annual 4,940
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,629 4,415,299
kWh
Electricity Demand $84,381 11,352
kW-mo/yr
Electricity Fees $5,856 -
Natural Gas $43,962 7,997
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,770 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $569

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7135: Install occupancy sensors $95 $216 $95
3,224
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $474 $81 $367
11,723
kWh
$107
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $2,201 $2,214 $1,389
44,842
kWh
$812
-
kW-mo/yr
- -
04 3.5316: Contract a wood pallet recycling company $3,000 $400 - - $3,000
-
lb
-
05 4.652: Replace existing equipment with more suitable substitutes $50,000 $28,500 - - - $50,000
TOTAL RECOMMENDED $55,770 $31,411 $1,851
59,789
kWh
$919
-
kW-mo/yr
$3,000
-
lb
$50,000
TOTAL IMPLEMENTED $569 $297 $462
14,947
kWh
$107
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs