ITAC Assessment: OK0798
ITAC logo
ITAC Assessment: OK0798
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Fencing
NAICS 331222: Steel Wire Drawing
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 333,691
ft2
Annual Production 110,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $922,387 17,388,000
kWh
Natural Gas $498,139 138,403
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $287,372 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,673

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $176,587 $1,026,000 $176,587
3,350,700
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $42,758 $239,328 $42,758
806,760
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,085 $5,205 $1,085
20,463
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $203 $2,009 $203
3,838
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $28,826 $900 $28,826
560,864
kWh
-
06 2.4226: Use / purchase optimum sized compressor $16,240 - $16,240
306,418
kWh
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $8,000 - $8,000
150,958
kWh
-
08 2.2511: Insulate bare equipment $8,199 $2,430 - $8,199
-
MMBtu
09 2.6232: Install set-back timers $3,115 $1,503 $3,115
58,768
kWh
-
10 2.7241: Install outside air damper / economizer on hvac unit $1,239 $11,718 $1,239
23,386
kWh
-
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,120 $1,991 $1,120
21,138
kWh
-
TOTAL RECOMMENDED $287,372 $1,291,084 $279,173
5,303,293
kWh
$8,199
-
MMBtu
TOTAL IMPLEMENTED $63,673 $12,535 $55,474
1,063,679
kWh
$8,199
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs