| Assessment Year | 2009 |
|---|---|
| Principal Product | Couplings |
| NAICS | 332710: Machine Shops |
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 160 |
| Plant Area |
140,117
ft2
|
| Annual Production | 960,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $514,740 | 6,169,503 |
kWh
|
$0.083 |
| Natural Gas | $277,177 | 25,146 |
MMBtu
|
$11.02 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $237,918 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $38,104 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 3.1191: Change procedures / equipment / operating conditions | $36,513 | $900,000 |
$15,090
173,252
kWh
|
- | - | $21,423 | |
| 02 | 3.1191: Change procedures / equipment / operating conditions | $122,608 | $160,000 |
$4,694
53,893
kWh
|
- | - | $117,914 | |
| 03 | 2.3137: Use power during off-peak periods | $30,940 | - | - |
$30,940
-
kW-mo/yr
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,076 | $6,396 |
$2,076
23,739
kWh
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,634 | $26,750 |
$20,634
237,104
kWh
|
- | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,089 | $14,467 |
$3,089
35,492
kWh
|
- | - | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,569 | - |
$11,569
145,369
kWh
|
- | - | - | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $2,812 | $1,944 |
$2,812
32,239
kWh
|
- | - | - | |
| 09 | 2.7261: Install timers and/or thermostats | $7,677 | $989 | - | - |
$7,677
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $237,918 | $1,110,546 |
$59,964
701,088
kWh
|
$30,940
-
kW-mo/yr
|
$7,677
-
MMBtu
|
$139,337 | ||
| TOTAL IMPLEMENTED | $38,104 | $43,161 |
$38,104
450,204
kWh
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs