ITAC Assessment: OK0779
ITAC logo
ITAC Assessment: OK0779
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Couplings
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 160
Plant Area 140,117
ft2
Annual Production 960,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $514,740 6,169,503
kWh
Natural Gas $277,177 25,146
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $237,918 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,104

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
01 3.1191: Change procedures / equipment / operating conditions $36,513 $900,000 $15,090
173,252
kWh
- - $21,423
02 3.1191: Change procedures / equipment / operating conditions $122,608 $160,000 $4,694
53,893
kWh
- - $117,914
03 2.3137: Use power during off-peak periods $30,940 - - $30,940
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,076 $6,396 $2,076
23,739
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $20,634 $26,750 $20,634
237,104
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,089 $14,467 $3,089
35,492
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,569 - $11,569
145,369
kWh
- - -
08 2.4221: Install compressor air intakes in coolest locations $2,812 $1,944 $2,812
32,239
kWh
- - -
09 2.7261: Install timers and/or thermostats $7,677 $989 - - $7,677
-
MMBtu
-
TOTAL RECOMMENDED $237,918 $1,110,546 $59,964
701,088
kWh
$30,940
-
kW-mo/yr
$7,677
-
MMBtu
$139,337
TOTAL IMPLEMENTED $38,104 $43,161 $38,104
450,204
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs