ITAC Assessment: OK0776
ITAC logo
ITAC Assessment: OK0776
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product RF Micriwave Absorbers, etc.
NAICS 493110: General Warehousing and Storage
SIC 4225: General Warehousing and Storage
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 100,000
ft2
Annual Production 3,500,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,169 1,366,000
kWh
Electricity Demand $22,941 3,785
kW-mo/yr
Natural Gas $239,259 31,065
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $91,620 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $538 $739 $538
7,913
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $882 - $882
13,188
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,054 - $1,054
15,620
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,270 $4,952 $1,270
18,757
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $8,941 $92,541 $8,941
132,063
kWh
- -
06 2.2136: Install / repair insulation on steam lines $2,373 $1,235 - - $2,373
-
MMBtu
07 2.1212: Operate boilers on high fire setting $6,763 $20,340 - - $6,763
-
MMBtu
08 2.7261: Install timers and/or thermostats $9,252 $2,759 - - $9,252
-
MMBtu
09 2.3212: Optimize plant power factor $3,061 $2,908 - $3,061
-
kW-mo/yr
-
10 4.114: Add/modify equipment to improve drying process $57,485 $63,000 - - $57,485
-
MMBtu
TOTAL RECOMMENDED $91,620 $188,474 $12,685
187,541
kWh
$3,061
-
kW-mo/yr
$75,873
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs