ITAC Assessment: OK0717
ITAC logo
ITAC Assessment: OK0717
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Face Bricks
NAICS 327120: Clay Building Material and Refractories Manufacturing
SIC 3251: Brick and Structural Clay Tile
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 82,100
ft2
Annual Production 21,000,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,109 2,189,358
kWh
Electricity Demand $68,265 5,573
kW-mo/yr
Electricity Fees $1,200 -
Natural Gas $523,887 93,898
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,950 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,019

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2414: Use waste heat from hot flue gases to preheat $38,551 $53,370 - - $38,551
-
MMBtu
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,162 $7,760 - $4,162
-
kW-mo/yr
- - -
03 2.4227: Use compressor air filters $111 $417 $63
1,393
kWh
$98
-
kW-mo/yr
- $(-50.0) -
04 2.2511: Insulate bare equipment $1,466 $1,039 - - $1,466
-
MMBtu
- -
05 2.4151: Develop a repair/replace policy $1,002 $9,712 $385
8,630
kWh
$617
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,658 $461 $731
16,399
kWh
$275
-
kW-mo/yr
- $1,305 $347
TOTAL RECOMMENDED $47,950 $72,759 $1,179
26,422
kWh
$5,152
-
kW-mo/yr
$40,017
-
MMBtu
$1,255 $347
TOTAL IMPLEMENTED $41,019 $64,121 $385
8,630
kWh
$617
-
kW-mo/yr
$40,017
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs