| Assessment Year | 1985 |
|---|---|
| Principal Product | WIENERS,SAUSAGE,BURGERS |
| NAICS |
n/a
|
| SIC | 2013: Sausages and Other Prepared Meat Products |
| Sales Range | $5 M to 10M |
| # of Employees | 55 |
| Plant Area |
n/a
|
| Annual Production | 6,500,000
lb
|
| Production Hrs. Annual | 4,940
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $85,229 | 1,415,885 |
kWh
|
$0.060 |
| Natural Gas | $36,355 | 8,832 |
MMBtu
|
$4.12 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,417 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,162 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $460 | $80 | - |
$460
-
MMBtu
|
- | |
| 02 | 2.2414: Use waste heat from hot flue gases to preheat | $359 | $2,000 | - |
$359
-
MMBtu
|
- | |
| 03 | 2.6218: Turn off equipment when not in use | $125 | $200 | - |
$125
-
MMBtu
|
- | |
| 04 | 2.2121: Increase amount of condensate returned | $139 | $180 | - |
$113
-
MMBtu
|
$26 | |
| 05 | 2.7229: Air condition only space necessary | $1,164 | $2,000 |
$1,164
19,343
kWh
|
- | - | |
| 06 | 2.2136: Install / repair insulation on steam lines | $838 | $95 | - |
$838
-
MMBtu
|
- | |
| 07 | 2.7229: Air condition only space necessary | $2,136 | $225 | - |
$2,136
-
MMBtu
|
- | |
| 08 | 2.7229: Air condition only space necessary | $3,403 | $84 |
$3,403
56,565
kWh
|
- | - | |
| 09 | 2.7261: Install timers and/or thermostats | $599 | $400 | - |
$599
-
MMBtu
|
- | |
| 10 | 2.7492: Use proper thickness of insulation on building envelope | $206 | $258 | - |
$206
-
MMBtu
|
- | |
| 11 | 2.2428: Use flue gases in radiant heater for space heating, ovens, etc | $924 | $5,000 | - |
$924
-
MMBtu
|
- | |
| 12 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,701 | - |
$1,701
-
kWh
|
- | - | |
| 13 | 2.5194: Redesign process | $1,481 | $1,140 |
$1,481
24,619
kWh
|
- | - | |
| 14 | 2.4312: Improve lubrication practices | $882 | $100 |
$882
14,654
kWh
|
- | - | |
| TOTAL RECOMMENDED | $14,417 | $11,762 |
$8,631
115,181
kWh
|
$5,760
-
MMBtu
|
$26 | ||
| TOTAL IMPLEMENTED | $7,162 | $3,180 |
$2,865
19,343
kWh
|
$4,271
-
MMBtu
|
$26 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs