ITAC Assessment: OR0115
ITAC logo
ITAC Assessment: OR0115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product ANIMAL FEED
NAICS
n/a
SIC 2047: Dog and Cat Food
Sales Range $1
M
to 5
M
# of Employees 12
Plant Area
n/a
Annual Production 2,500
ton
Production Hrs. Annual 2,754
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,527 373,681
kWh
Natural Gas $7,832 1,661
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,156 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2163: Use minimum steam operating pressure $126 - - $126
-
MMBtu
-
02 2.2121: Increase amount of condensate returned $142 $175 - $142
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,297 - $1,331
24,912
kWh
- $966
04 2.4133: Use most efficient type of electric motors $85 $284 $85
1,172
kWh
- -
05 2.3212: Optimize plant power factor $506 $2,700 $506
-
kWh
- -
TOTAL RECOMMENDED $3,156 $3,159 $1,922
26,084
kWh
$268
-
MMBtu
$966
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs