ITAC Assessment: OK0710
ITAC logo
ITAC Assessment: OK0710
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Batch Inclusion Bags & Pre-weight Chemicals
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2895: Carbon Black
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 60,000
ft2
Annual Production 45,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,090 1,883,600
kWh
Electricity Demand $20,189 3,601
kW-mo/yr
Electricity Fees $31,851 -
Natural Gas $16,269 1,503
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,200 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,914

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4153: Avoid emergency rewind of motors $18,566 $18,454 $18,566
635,820
kWh
- - - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,475 $3,550 - $2,475
-
kW-mo/yr
- - -
03 2.6232: Install set-back timers $1,403 $430 - - $1,403
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,823 $1,607 $1,116
38,220
kWh
$707
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,439 $4,746 $589
20,188
kWh
$525
-
kW-mo/yr
- - $325
06 2.7135: Install occupancy sensors $467 $356 $467
15,990
kWh
- - - -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $729 $30 $606
20,726
kWh
$123
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $298 $895 $77
2,628
kWh
$20
-
kW-mo/yr
- $168 $33
TOTAL RECOMMENDED $27,200 $30,068 $21,421
733,572
kWh
$3,850
-
kW-mo/yr
$1,403
-
MMBtu
$168 $358
TOTAL IMPLEMENTED $3,914 $8,296 $589
20,188
kWh
$3,000
-
kW-mo/yr
- - $325
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs