ITAC Assessment: SF0258
ITAC logo
ITAC Assessment: SF0258
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Recycled Water, Tertiary Treated Wastewater
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $5
M
to 10
M
# of Employees 56
Plant Area 1,500,000
ft2
Annual Production 39,000
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $687,992 7,949,767
kWh
Electricity Demand $184,631 19,284
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $359,834 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,680

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $10,511 - $7,305
84,455
kWh
$3,206
-
kW-mo/yr
-
02 2.4224: Upgrade controls on compressors $2,432 $580 $2,211
25,567
kWh
$221
-
kW-mo/yr
-
03 2.2437: Recover waste heat from equipment $121,871 $70,000 $105,793
1,223,040
kWh
$16,078
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $4,255 $3,120 $3,641
42,092
kWh
$614
-
kW-mo/yr
-
05 2.4133: Use most efficient type of electric motors $6,169 $4,761 $5,413
62,583
kWh
$756
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $82,069 $76,562 $70,307
812,800
kWh
$11,762
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $29,851 $48,000 $25,913
299,574
kWh
$3,938
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,213 $27,140 $10,623
122,806
kWh
$1,590
-
kW-mo/yr
-
09 2.7132: Install timers on light switches in little used areas $5,950 $25,615 $5,165
59,715
kWh
$785
-
kW-mo/yr
-
10 3.6112: Use filter and drying oven to reduce sludge volume $84,513 $145,200 - - $84,513
-
lb
TOTAL RECOMMENDED $359,834 $400,978 $236,371
2,732,632
kWh
$38,950
-
kW-mo/yr
$84,513
-
lb
TOTAL IMPLEMENTED $16,680 $4,761 $12,718
147,038
kWh
$3,962
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs