Assessment Year | 2004 |
---|---|
Principal Product | Air Conditioning Units |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $100 M to 500M |
# of Employees | 1,300 |
Plant Area |
1,000,000
ft2
|
Annual Production | 345,000
pieces
|
Production Hrs. Annual | 5,304
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $818,311 | 27,722,213 |
kWh
|
$0.030 |
Electricity Demand | $250,793 | 62,108 |
kW-mo/yr
|
$4.04 |
Electricity Fees | $3,345 | - |
|
- |
Natural Gas | $462,161 | 84,191 |
MMBtu
|
$5.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $820,368 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $120,284 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $24,239 | $2,275 |
$19,201
650,880
kWh
|
$5,913
-
kW-mo/yr
|
- | $(-875.0) | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $11,206 | $10,250 |
$11,206
379,851
kWh
|
- | - | - | - | |
03 | 2.4227: Use compressor air filters | $5,114 | $7,875 |
$3,912
132,600
kWh
|
$1,202
-
kW-mo/yr
|
- | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,221 | $8,625 |
$1,221
41,391
kWh
|
- | - | - | - | |
05 | 2.3132: Recharge batteries on during off-peak demand periods | $1,389 | $6,675 | - |
$1,389
-
kW-mo/yr
|
- | - | - | |
06 | 2.6232: Install set-back timers | $81,447 | $10,000 | - | - |
$81,447
-
MMBtu
|
- | - | |
07 | 4.611: Begin a practice of predictive / preventative maintenance | $8,800 | - | - | - | - | $8,800 | - | |
08 | 2.7124: Make a practice of turning off lights when not needed | $17,464 | $5,050 |
$17,464
591,993
kWh
|
- | - | - | - | |
09 | 2.7141: Lower light fixtures in high ceiling areas | $663,000 | $130,000 | - | - | - | $663,000 | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,577 | $11,882 |
$2,204
74,722
kWh
|
$1,634
-
kW-mo/yr
|
- | - | $739 | |
11 | 2.7135: Install occupancy sensors | $1,911 | $1,690 |
$1,911
64,795
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $820,368 | $194,322 |
$57,119
1,936,232
kWh
|
$10,138
-
kW-mo/yr
|
$81,447
-
MMBtu
|
$670,925 | $739 | ||
TOTAL IMPLEMENTED | $120,284 | $32,782 |
$22,626
766,993
kWh
|
$7,547
-
kW-mo/yr
|
$81,447
-
MMBtu
|
$7,925 | $739 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs