ITAC Assessment: MA0056
ITAC logo
ITAC Assessment: MA0056
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product ZINC DIE-CAST PRODUCTS
NAICS
n/a
SIC 3369: Nonferrous Foundries, Except Aluminum and Copper
Sales Range $1
M
to 5
M
# of Employees 26
Plant Area
n/a
Annual Production 800,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,297 211,899
kWh
Natural Gas $38,222 4,879
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,596 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,859

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7226: Use computer programs to optimize hvac performance $1,510 $2,500 $1,510
11,723
kWh
- -
02 2.2514: Cover open tanks $157 - - $157
-
MMBtu
-
03 2.4239: Eliminate or reduce compressed air usage $1,812 $1,700 $1,812
14,068
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $566 $109 $566
4,396
kWh
- -
05 2.7261: Install timers and/or thermostats $2,380 $1,200 - $2,380
-
MMBtu
-
06 2.7494: Install storm windows and doors $1,206 $1,760 - $1,206
-
MMBtu
-
07 2.2449: Recover heat from exhausted steam, hot air or hot water $6,965 - $(-2,303.0)
(-17,878)
kWh
$5,003
-
MMBtu
$4,265
TOTAL RECOMMENDED $14,596 $7,269 $1,585
12,309
kWh
$8,746
-
MMBtu
$4,265
TOTAL IMPLEMENTED $5,859 $5,400 $3,322
25,791
kWh
$2,537
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs