ITAC Assessment: OK0682
ITAC logo
ITAC Assessment: OK0682
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Bedding Pillows, Comforters, Texile
NAICS 314120: Curtain and Linen Mills
SIC 2392: House furnishing, Except Curtains and Draperies
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 7,800,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,273 1,584,300
kWh
Electricity Fees $5,593 -
Natural Gas $19,588 2,492
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,788 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,096

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6232: Install set-back timers $1,572 $163 - - $1,572
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $906 $6,187 $566
17,680
kWh
$354
-
kW-mo/yr
- - $(-14.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $96 $200 $43
1,352
kWh
$27
-
kW-mo/yr
- - $26
04 2.7135: Install occupancy sensors $738 $682 $738
23,072
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $419 $3,000 $168
5,256
kWh
$31
-
kW-mo/yr
- - $220
06 2.2511: Insulate bare equipment $132 $92 $132
4,113
kWh
- - - -
07 2.4224: Upgrade controls on compressors $3,374 $15,000 $2,676
83,616
kWh
$698
-
kW-mo/yr
- - -
08 2.2437: Recover waste heat from equipment $4,455 $2,134 - - $4,455
-
MMBtu
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $892 $438 $710
22,173
kWh
$182
-
kW-mo/yr
- - -
10 2.4323: Use optimum size and capacity equipment $2,483 $1,200 $2,483
77,584
kWh
- - - -
11 2.7111: Reduce illumination to minimum necessary levels $1,729 $130 $1,458
45,552
kWh
$271
-
kW-mo/yr
- - -
12 4.111: Add equipment/ operators to reduce production bottleneck $15,392 $10,000 - - - $15,392 -
13 4.611: Begin a practice of predictive / preventative maintenance $1,600 - - - - $(-2,000.0) $3,600
TOTAL RECOMMENDED $33,788 $39,226 $8,974
280,398
kWh
$1,563
-
kW-mo/yr
$6,027
-
MMBtu
$13,392 $3,832
TOTAL IMPLEMENTED $23,096 $15,483 $4,099
128,085
kWh
$213
-
kW-mo/yr
$1,572
-
MMBtu
$13,392 $3,820
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs