Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Fabricated Metal Products
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 175,000
ft2
Annual Production 9,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,720 3,782,532
kWh
Electricity Demand $86,327 12,911
kW-mo/yr
Natural Gas $72,572 15,433
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,598 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $324 $880 $249
5,569
kWh
$75
-
kW-mo/yr
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $249 - $192
4,396
kWh
$57
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,887 $7,458 $3,690
80,305
kWh
$1,197
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $659 $316 - $12
-
kW-mo/yr
$349
-
MMBtu
- $298
05 2.4221: Install compressor air intakes in coolest locations $1,467 $50 $1,130
25,498
kWh
$337
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,369 $60 $2,591
58,617
kWh
$778
-
kW-mo/yr
- - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $11,643 $8,000 $(-232.0)
(-1,172)
kWh
- - $11,875
-
lb
-
08 4.513: Re-arrange equipment layout to reduce labor costs - $6,000 - - - - -
TOTAL RECOMMENDED $22,598 $22,764 $7,620
173,213
kWh
$2,456
-
kW-mo/yr
$349
-
MMBtu
$11,875
-
lb
$298
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs