ITAC Assessment: LL0153
ITAC logo
ITAC Assessment: LL0153
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Water treatment Chemicals
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 170
Plant Area 1,960,000
ft2
Annual Production 540,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $853,759 30,803,500
kWh
Electricity Demand $668,004 48,162
kW-mo/yr
Electricity Fees $60,681 -
Natural Gas $2,835,989 736,637
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $613,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $224,433

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $380,533 $1,670,381 $853,759
30,803,500
kWh
$648,450
-
kW-mo/yr
$14,636 $(-1,136,312.0)
-
MMBtu
-
02 2.2135: Repair and eliminate steam leaks $161,946 $1,070 - - - $161,946
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $33,083 $12,084 $31,811
1,147,599
kWh
- $1,272 - -
04 2.7111: Reduce illumination to minimum necessary levels $5,268 $983 $2,901
104,667
kWh
$2,164
-
kW-mo/yr
$203 - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,444 - $2,317
83,576
kWh
$1,956
-
kW-mo/yr
$171 - -
06 2.7135: Install occupancy sensors $2,537 - $1,024
36,946
kWh
$1,415
-
kW-mo/yr
$98 - -
07 2.7134: Use photocell controls $1,148 $494 $605
21,821
kWh
$499
-
kW-mo/yr
$44 - -
08 3.5313: Increase amount of waste recovered for resale $24,960 - - - - - $24,960
-
lb
TOTAL RECOMMENDED $613,919 $1,685,012 $892,417
32,198,109
kWh
$654,484
-
kW-mo/yr
$16,424 $(-974,366.0)
-
MMBtu
$24,960
-
lb
TOTAL IMPLEMENTED $224,433 $13,154 $34,128
1,231,175
kWh
$1,956
-
kW-mo/yr
$1,443 $161,946
-
MMBtu
$24,960
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs