| Assessment Year | 2003 |
|---|---|
| Principal Product | LUMBER |
| NAICS | 321912: Cut Stock, Resawing Lumber, and Planing |
| SIC | 2421: Sawmills and Planing Mills, General |
| Sales Range | $10 M to 50M |
| # of Employees | 125 |
| Plant Area |
332,500
ft2
|
| Annual Production | 100,000,000
units
|
| Production Hrs. Annual | 2,500
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $645,463 | 13,578,108 |
kWh
|
$0.048 |
| Electricity Demand | $34,328 | 1,739 |
kW-mo/yr
|
$19.74 |
| Natural Gas | $1,948 | 179 |
MMBtu
|
$10.88 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $138,634 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $480 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4314: Use synthetic lubricant | $930 | - |
$930
30,250
kWh
|
- | |
| 02 | 2.4226: Use / purchase optimum sized compressor | $6,800 | $4,500 |
$6,800
218,000
kWh
|
- | |
| 03 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $4,100 | $1,500 |
$(-25.0)
(-800)
kWh
|
$4,125 | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,464 | $20,971 |
$6,464
210,269
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,366 | $7,491 |
$2,366
76,965
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,359 | $5,565 |
$1,359
44,196
kWh
|
- | |
| 07 | 2.7124: Make a practice of turning off lights when not needed | $16,327 | $8,458 |
$16,327
531,137
kWh
|
- | |
| 08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $45,950 | $71,400 |
$45,950
1,494,878
kWh
|
- | |
| 09 | 2.4133: Use most efficient type of electric motors | $38,766 | $17,133 |
$38,766
229,871
kWh
|
- | |
| 10 | 2.4133: Use most efficient type of electric motors | $15,092 | $50,185 |
$15,092
164,094
kWh
|
- | |
| 11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $480 | $650 |
$480
15,555
kWh
|
- | |
| TOTAL RECOMMENDED | $138,634 | $187,853 |
$134,509
3,014,415
kWh
|
$4,125 | ||
| TOTAL IMPLEMENTED | $480 | $650 |
$480
15,555
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs