ITAC Assessment: GT0755
ITAC logo
ITAC Assessment: GT0755
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product LUMBER
NAICS 321912: Cut Stock, Resawing Lumber, and Planing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 332,500
ft2
Annual Production 100,000,000
units
Production Hrs. Annual 2,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $645,463 13,578,108
kWh
Electricity Demand $34,328 1,739
kW-mo/yr
Natural Gas $1,948 179
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $138,634 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 2.4314: Use synthetic lubricant $930 - $930
30,250
kWh
-
02 2.4226: Use / purchase optimum sized compressor $6,800 $4,500 $6,800
218,000
kWh
-
03 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $4,100 $1,500 $(-25.0)
(-800)
kWh
$4,125
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,464 $20,971 $6,464
210,269
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,366 $7,491 $2,366
76,965
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,359 $5,565 $1,359
44,196
kWh
-
07 2.7124: Make a practice of turning off lights when not needed $16,327 $8,458 $16,327
531,137
kWh
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $45,950 $71,400 $45,950
1,494,878
kWh
-
09 2.4133: Use most efficient type of electric motors $38,766 $17,133 $38,766
229,871
kWh
-
10 2.4133: Use most efficient type of electric motors $15,092 $50,185 $15,092
164,094
kWh
-
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $480 $650 $480
15,555
kWh
-
TOTAL RECOMMENDED $138,634 $187,853 $134,509
3,014,415
kWh
$4,125
TOTAL IMPLEMENTED $480 $650 $480
15,555
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs