ITAC Assessment: SU0307
ITAC logo
ITAC Assessment: SU0307
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Recycled Commodities
NAICS 562920: Materials Recovery Facilities
SIC 4953: Refuse Systems
Sales Range $1
M
to 5
M
# of Employees 41
Plant Area 68,000
ft2
Annual Production 40,000
ton
Production Hrs. Annual 4,680
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,898 1,363,291
kWh
Electricity Demand $53,595 6,041
kW-mo/yr
Electricity Fees $11,409 -
Natural Gas $55,571 3,330
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,588 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,203

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,744 - $1,744
25,272
kWh
- - - -
02 2.8121: Apply for tax-free status for energy purchases $2,054 - - - - - $2,054
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $323 $97 $323
4,680
kWh
- - - -
04 2.4221: Install compressor air intakes in coolest locations $1,550 $920 $1,550
22,464
kWh
- - - -
05 2.2442: Preheat combustion air with waste heat $16,557 $21,257 - - - $16,557
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $9,579 $21,668 $7,202
104,364
kWh
$2,377
-
kW-mo/yr
- - -
07 2.6211: Conserve energy by efficient use of vending machines $139 $287 $139
2,021
kWh
- - - -
08 2.3212: Optimize plant power factor $642 $4,591 - - $642 - -
TOTAL RECOMMENDED $32,588 $48,820 $10,958
158,801
kWh
$2,377
-
kW-mo/yr
$642 $16,557
-
MMBtu
$2,054
TOTAL IMPLEMENTED $28,203 $43,022 $9,269
134,316
kWh
$2,377
-
kW-mo/yr
- $16,557
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings