ITAC Assessment: AT0089
ITAC logo
ITAC Assessment: AT0089
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product WOOD DINING TABLES
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 137,500
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,545 1,170,574
kWh
Wood $8,571 6,880
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,892 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,892

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $11,075 $3,418 $4,475
98,769
kWh
$6,000
-
MMBtu
$600
02 2.4133: Use most efficient type of electric motors $412 $562 $412
6,448
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,924 $4,140 $1,924
29,894
kWh
- -
04 2.4312: Improve lubrication practices $1,159 - $1,159
17,878
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $758 - $758
11,723
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $564 $900 $564
8,792
kWh
- -
TOTAL RECOMMENDED $15,892 $9,020 $9,292
173,504
kWh
$6,000
-
MMBtu
$600
TOTAL IMPLEMENTED $15,892 $9,020 $9,292
173,504
kWh
$6,000
-
MMBtu
$600
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs