Assessment Year | 2003 |
---|---|
Principal Product | Metal Stampings |
NAICS |
n/a
|
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 105 |
Plant Area |
75,000
ft2
|
Annual Production | 15
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $110,115 | 3,019,026 |
kWh
|
$0.036 |
Electricity Demand | $62,140 | 9,560 |
kW-mo/yr
|
$6.50 |
Electricity Fees | $5,336 | - |
|
- |
Natural Gas | $79,739 | 16,972 |
MMBtu
|
$4.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $102,162 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,697 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $10,530 | $6,844 | - |
$10,530
-
kW-mo/yr
|
- | - | |
02 | 2.2515: Use optimum thickness insulation | $14,697 | $8,210 | - | - |
$14,697
-
MMBtu
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,582 | $600 |
$5,882
214,445
kWh
|
- | - | $(-300.0) | |
04 | 2.2442: Preheat combustion air with waste heat | $3,904 | $13,860 | - | - |
$3,904
-
MMBtu
|
- | |
05 | 2.6232: Install set-back timers | $5,337 | $3,280 | - | - |
$5,337
-
MMBtu
|
- | |
06 | 4.513: Re-arrange equipment layout to reduce labor costs | $25,432 | $4,800 | - | - | - | $25,432 | |
07 | 4.446: Automate finishing process | $36,680 | $73,250 | - | - | - | $36,680 | |
TOTAL RECOMMENDED | $102,162 | $110,844 |
$5,882
214,445
kWh
|
$10,530
-
kW-mo/yr
|
$23,938
-
MMBtu
|
$61,812 | ||
TOTAL IMPLEMENTED | $14,697 | $8,210 | - | - |
$14,697
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs