Assessment Year | 2002 |
---|---|
Principal Product | Electric winches |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
127,000
ft2
|
Annual Production | 40,000
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $164,930 | 2,958,800 |
kWh
|
$0.056 |
Electricity Demand | $873 | - |
|
- |
Electricity Fees | $2,656 | - |
|
- |
Natural Gas | $54,029 | 7,945 |
MMBtu
|
$6.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $277,006 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,419 | $20,491 | n/a |
$3,888
69,805
kWh
|
- | - | $3,531 |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,926 | $1,360 | n/a |
$6,326
113,573
kWh
|
- | $(-400.0) | - |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,142 | $2,300 | n/a |
$1,142
20,509
kWh
|
- | - | - |
04 | 2.7141: Lower light fixtures in high ceiling areas | $131,274 | $26,000 | n/a | - | - | $131,274 | - |
05 | 2.6232: Install set-back timers | $10,697 | $1,416 | n/a | - |
$10,697
-
MMBtu
|
- | - |
06 | 2.7135: Install occupancy sensors | $741 | $975 | n/a |
$741
13,304
kWh
|
- | - | - |
07 | 4.424: Improve space comfort conditioning | $37,907 | $36,300 | n/a |
$1,897
34,056
kWh
|
- | $36,010 | - |
08 | 4.513: Re-arrange equipment layout to reduce labor costs | $11,700 | $1,350 | n/a | - | - | $11,700 | - |
09 | 4.321: Optimize production lot sizes and inventories | $23,400 | $80,000 | n/a | - | - | $23,400 | - |
10 | 4.424: Improve space comfort conditioning | $46,800 | $2,500 | n/a | - | - | $46,800 | - |
TOTAL RECOMMENDED | $277,006 | $172,692 |
$13,994
251,247
kWh
|
$10,697
-
MMBtu
|
$248,784 | $3,531 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs