ITAC Assessment: OK0651
ITAC logo
ITAC Assessment: OK0651
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Electric winches
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 127,000
ft2
Annual Production 40,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $164,930 2,958,800
kWh
Electricity Demand $873 -
Electricity Fees $2,656 -
Natural Gas $54,029 7,945
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $277,006 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,419 $20,491 n/a $3,888
69,805
kWh
- - $3,531
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,926 $1,360 n/a $6,326
113,573
kWh
- $(-400.0) -
03 2.4221: Install compressor air intakes in coolest locations $1,142 $2,300 n/a $1,142
20,509
kWh
- - -
04 2.7141: Lower light fixtures in high ceiling areas $131,274 $26,000 n/a - - $131,274 -
05 2.6232: Install set-back timers $10,697 $1,416 n/a - $10,697
-
MMBtu
- -
06 2.7135: Install occupancy sensors $741 $975 n/a $741
13,304
kWh
- - -
07 4.424: Improve space comfort conditioning $37,907 $36,300 n/a $1,897
34,056
kWh
- $36,010 -
08 4.513: Re-arrange equipment layout to reduce labor costs $11,700 $1,350 n/a - - $11,700 -
09 4.321: Optimize production lot sizes and inventories $23,400 $80,000 n/a - - $23,400 -
10 4.424: Improve space comfort conditioning $46,800 $2,500 n/a - - $46,800 -
TOTAL RECOMMENDED $277,006 $172,692 $13,994
251,247
kWh
$10,697
-
MMBtu
$248,784 $3,531
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs