| Assessment Year | 2002 |
|---|---|
| Principal Product | Wheat Flour |
| NAICS |
n/a
|
| SIC | 2041: Flour and Other Grain Mill Products |
| Sales Range | $10 M to 50M |
| # of Employees | 23 |
| Plant Area |
21,000
ft2
|
| Annual Production | 50,000
ton
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $181,699 | 5,047,200 |
kWh
|
$0.036 |
| Electricity Demand | $72,924 | - |
|
- |
| Electricity Fees | $61,163 | - |
|
- |
| Natural Gas | $32,273 | 5,451 |
MMBtu
|
$5.92 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $30,914 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $18,633 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $1,976 | $3,150 | - | - | - | $1,976 | - | |
| 02 | 2.6232: Install set-back timers | $469 | $93 | - |
$469
-
MMBtu
|
- | - | - | |
| 03 | 3.4116: Meter recycled water (to reduce sewer charges) | $659 | - | - | - | - | $659 | - | |
| 04 | 3.6192: Use a less expensive method of waste removal | $13,960 | - | - | - | $(-1,040.0) | $15,000 | - | |
| 05 | 2.6231: Utilize controls to operate equipment only when needed | $113 | $60 |
$113
3,154
kWh
|
- | - | - | - | |
| 06 | 2.4224: Upgrade controls on compressors | $1,858 | $150 |
$2,258
62,735
kWh
|
- | $(-200.0) | - | $(-200.0) | |
| 07 | 2.2136: Install / repair insulation on steam lines | $3,545 | $5,270 | - |
$3,545
-
MMBtu
|
- | - | - | |
| 08 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $8,334 | $9,000 | - |
$8,334
-
MMBtu
|
- | - | - | |
| TOTAL RECOMMENDED | $30,914 | $17,723 |
$2,371
65,889
kWh
|
$12,348
-
MMBtu
|
$(-1,240.0) | $17,635 | $(-200.0) | ||
| TOTAL IMPLEMENTED | $18,633 | $5,363 | - |
$4,014
-
MMBtu
|
$(-1,040.0) | $15,659 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs