| Assessment Year | 2001 |
|---|---|
| Principal Product | Aircraft Parts |
| NAICS |
n/a
|
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 170 |
| Plant Area |
86,000
ft2
|
| Annual Production | 2,500
pieces
|
| Production Hrs. Annual | 6,552
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $131,174 | 3,695,740 |
kWh
|
$0.035 |
| Electricity Demand | $60,575 | 5,500 |
kW-mo/yr
|
$11.01 |
| Electricity Fees | $2,842 | - |
|
- |
| LPG | $7,657 | 594 |
MMBtu
|
$12.89 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $726,997 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $722,265 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,626 | $2,120 |
$8,866
249,739
kWh
|
- | - | - | $(-240.0) | - | |
| 02 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $6,659 | $1,089 |
$4,250
119,705
kWh
|
$2,409
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.6218: Turn off equipment when not in use | $1,700 | $654 | - | - |
$1,700
-
MMBtu
|
- | - | - | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $1,944 | $100 |
$1,240
34,922
kWh
|
$704
-
kW-mo/yr
|
- | - | - | - | |
| 05 | 2.6232: Install set-back timers | $2,788 | $288 |
$1,654
46,592
kWh
|
- |
$1,134
-
MMBtu
|
- | - | - | |
| 06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $70,100 | $152,055 | - | - | - |
$70,100
-
lb
|
- | - | |
| 07 | 4.122: Develop standard procedures to improve internal yields | $635,180 | $125,000 | - | - | - | - | - | $635,180 | |
| TOTAL RECOMMENDED | $726,997 | $281,306 |
$16,010
450,958
kWh
|
$3,113
-
kW-mo/yr
|
$2,834
-
MMBtu
|
$70,100
-
lb
|
$(-240.0) | $635,180 | ||
| TOTAL IMPLEMENTED | $722,265 | $280,918 |
$13,116
369,444
kWh
|
$2,409
-
kW-mo/yr
|
$1,700
-
MMBtu
|
$70,100
-
lb
|
$(-240.0) | $635,180 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs