ITAC Assessment: OK0598
ITAC logo
ITAC Assessment: OK0598
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Aviation Structural Components
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 44,500
ft2
Annual Production 2,000
pieces
Production Hrs. Annual 5,460
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,141 1,259,209
kWh
Electricity Fees $1,183 -
Natural Gas $3,238 498
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,936 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,506

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $789 $2,250 $789
16,417
kWh
- -
02 2.4239: Eliminate or reduce compressed air usage $2,182 $700 $2,182
45,428
kWh
- -
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $323 $86 $323
6,741
kWh
- -
04 2.7135: Install occupancy sensors $887 $1,980 $887
18,464
kWh
- -
05 2.6232: Install set-back timers $535 $936 $181
3,810
kWh
$354
-
MMBtu
-
06 2.7241: Install outside air damper / economizer on hvac unit $920 $2,000 $920
19,343
kWh
- -
07 4.111: Add equipment/ operators to reduce production bottleneck $27,300 $16,150 - - $27,300
TOTAL RECOMMENDED $32,936 $24,102 $5,282
110,203
kWh
$354
-
MMBtu
$27,300
TOTAL IMPLEMENTED $3,506 $3,886 $3,152
65,655
kWh
$354
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs