Assessment Year | 1999 |
---|---|
Principal Product | Tags and Labels |
NAICS |
n/a
|
SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
25,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,608
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $32,598 | 674,091 |
kWh
|
$0.048 |
Electricity Fees | $653 | - |
|
- |
Natural Gas | $2,909 | 590 |
MMBtu
|
$4.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $200,452 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7241: Install outside air damper / economizer on hvac unit | $2,155 | $2,668 | n/a |
$2,155
54,513
kWh
|
- | - | - |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $(-1,464.0) | $4,300 | n/a |
$1,594
77,374
kWh
|
$(-3,058.0)
-
MMBtu
|
- | - |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,788 | - | n/a |
$2,788
70,633
kWh
|
- | - | - |
04 | 2.4221: Install compressor air intakes in coolest locations | $2,121 | $1,162 | n/a |
$2,121
53,634
kWh
|
- | - | - |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $179 | $360 | n/a |
$179
2,931
kWh
|
- | - | - |
06 | 2.6232: Install set-back timers | $507 | $260 | n/a |
$507
30,774
kWh
|
- | - | - |
07 | 4.323: Optimize lot sizes to reduce inventory carrying costs | $45,623 | $17,000 | n/a | - | - | - | $45,623 |
08 | 4.624: Hire additional personnel to reduce changeout time | $147,498 | $25,000 | n/a | - | - | - | $147,498 |
09 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $1,045 | - | n/a | - | - |
$1,045
-
lb
|
- |
TOTAL RECOMMENDED | $200,452 | $50,750 |
$9,344
289,859
kWh
|
$(-3,058.0)
-
MMBtu
|
$1,045
-
lb
|
$193,121 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs