ITAC Assessment: OK0585
ITAC logo
ITAC Assessment: OK0585
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Tags and Labels
NAICS
n/a
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 25,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,608
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,598 674,091
kWh
Electricity Fees $653 -
Natural Gas $2,909 590
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $200,452 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7241: Install outside air damper / economizer on hvac unit $2,155 $2,668 n/a $2,155
54,513
kWh
- - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $(-1,464.0) $4,300 n/a $1,594
77,374
kWh
$(-3,058.0)
-
MMBtu
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,788 - n/a $2,788
70,633
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $2,121 $1,162 n/a $2,121
53,634
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $179 $360 n/a $179
2,931
kWh
- - -
06 2.6232: Install set-back timers $507 $260 n/a $507
30,774
kWh
- - -
07 4.323: Optimize lot sizes to reduce inventory carrying costs $45,623 $17,000 n/a - - - $45,623
08 4.624: Hire additional personnel to reduce changeout time $147,498 $25,000 n/a - - - $147,498
09 3.5315: Lease / purchase baler; sell cardboard to recycler $1,045 - n/a - - $1,045
-
lb
-
TOTAL RECOMMENDED $200,452 $50,750 $9,344
289,859
kWh
$(-3,058.0)
-
MMBtu
$1,045
-
lb
$193,121
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs