ITAC Assessment: GT0818
ITAC logo
ITAC Assessment: GT0818
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Vinyl Coated Mesh Fabric
NAICS 313320: Fabric Coating Mills
SIC 2295: Coated Fabrics, Not Rubberized
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 50,000
ft2
Annual Production 1,170
thousand feet
Production Hrs. Annual 8,720
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,495 1,212,960
kWh
Electricity Demand $36,072 2,666
kW-mo/yr
Natural Gas $164,926 10,459
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $183,603 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,076

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,499 $4,242 $4,037
118,033
kWh
$2,462
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $577 $356 $358
10,464
kWh
$219
-
kW-mo/yr
- -
03 2.5113: Use direct flame impingement or infrared processing for chamber type heating $71,569 $250,000 $(-54,141.0)
(-1,583,080)
kWh
$(-39,216.0)
-
kW-mo/yr
$164,926
-
MMBtu
-
04 2.8114: Change rate schedules or other changes in utility service $46,640 $7,200 - - - $46,640
05 2.1113: Reduce combustion air flow to optimum $37,004 $3,300 - - $37,004
-
MMBtu
-
06 2.2414: Use waste heat from hot flue gases to preheat $21,314 $7,500 - - $21,314
-
MMBtu
-
TOTAL RECOMMENDED $183,603 $272,598 $(-49,746.0)
(-1,454,583)
kWh
$(-36,535.0)
-
kW-mo/yr
$223,244
-
MMBtu
$46,640
TOTAL IMPLEMENTED $7,076 $4,598 $4,395
128,497
kWh
$2,681
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs