Assessment Year | 2006 |
---|---|
Principal Product | Vinyl Coated Mesh Fabric |
NAICS | 313320: Fabric Coating Mills |
SIC | 2295: Coated Fabrics, Not Rubberized |
Sales Range | $5 M to 10M |
# of Employees | 70 |
Plant Area |
50,000
ft2
|
Annual Production | 1,170
thousand feet
|
Production Hrs. Annual | 8,720
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $41,495 | 1,212,960 |
kWh
|
$0.034 |
Electricity Demand | $36,072 | 2,666 |
kW-mo/yr
|
$13.53 |
Natural Gas | $164,926 | 10,459 |
MMBtu
|
$15.77 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $183,603 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,076 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,499 | $4,242 |
$4,037
118,033
kWh
|
$2,462
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $577 | $356 |
$358
10,464
kWh
|
$219
-
kW-mo/yr
|
- | - | |
03 | 2.5113: Use direct flame impingement or infrared processing for chamber type heating | $71,569 | $250,000 |
$(-54,141.0)
(-1,583,080)
kWh
|
$(-39,216.0)
-
kW-mo/yr
|
$164,926
-
MMBtu
|
- | |
04 | 2.8114: Change rate schedules or other changes in utility service | $46,640 | $7,200 | - | - | - | $46,640 | |
05 | 2.1113: Reduce combustion air flow to optimum | $37,004 | $3,300 | - | - |
$37,004
-
MMBtu
|
- | |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $21,314 | $7,500 | - | - |
$21,314
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $183,603 | $272,598 |
$(-49,746.0)
(-1,454,583)
kWh
|
$(-36,535.0)
-
kW-mo/yr
|
$223,244
-
MMBtu
|
$46,640 | ||
TOTAL IMPLEMENTED | $7,076 | $4,598 |
$4,395
128,497
kWh
|
$2,681
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs