Assessment Year | 1999 |
---|---|
Principal Product | Vitamins |
NAICS |
n/a
|
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $10 M to 50M |
# of Employees | 240 |
Plant Area |
400,000
ft2
|
Annual Production | 15,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $511,740 | 18,710,434 |
kWh
|
$0.027 |
Electricity Demand | $202,590 | - |
|
- |
Electricity Fees | $(-8,483.0) | - |
|
- |
Natural Gas | $233,529 | 91,149 |
MMBtu
|
$2.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,070 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,247 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $28,907 | - | - | - | - | - | $28,907 | - | |
02 | 3.6122: Install solid waste incinerator for heat | $7,077 | - | - | - | - |
$7,077
-
lb
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $5,306 | $5,625 |
$4,052
157,679
kWh
|
$1,254
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $2,556 | $117 |
$1,952
75,909
kWh
|
$604
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,344 | $1,600 |
$428
16,706
kWh
|
$132
-
kW-mo/yr
|
- | - | - | $784 | |
06 | 2.7135: Install occupancy sensors | $1,179 | $1,380 |
$923
19,930
kWh
|
$256
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.2511: Insulate bare equipment | $784 | $3,820 |
$784
89,683
kWh
|
- | - | - | - | - | |
08 | 2.6232: Install set-back timers | $692 | $1,050 | - | - |
$692
-
MMBtu
|
- | - | - | |
09 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $225 | $161 |
$136
1,172
kWh
|
$89
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $48,070 | $13,753 |
$8,275
361,079
kWh
|
$2,335
-
kW-mo/yr
|
$692
-
MMBtu
|
$7,077
-
lb
|
$28,907 | $784 | ||
TOTAL IMPLEMENTED | $32,247 | $3,937 |
$2,736
165,592
kWh
|
$604
-
kW-mo/yr
|
- | - | $28,907 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs