ITAC Assessment: OK0577
ITAC logo
ITAC Assessment: OK0577
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Vitamins
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 400,000
ft2
Annual Production 15,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $511,740 18,710,434
kWh
Electricity Demand $202,590 -
Electricity Fees $(-8,483.0) -
Natural Gas $233,529 91,149
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,070 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,247

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $28,907 - - - - - $28,907 -
02 3.6122: Install solid waste incinerator for heat $7,077 - - - - $7,077
-
lb
- -
03 2.4221: Install compressor air intakes in coolest locations $5,306 $5,625 $4,052
157,679
kWh
$1,254
-
kW-mo/yr
- - - -
04 2.7111: Reduce illumination to minimum necessary levels $2,556 $117 $1,952
75,909
kWh
$604
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,344 $1,600 $428
16,706
kWh
$132
-
kW-mo/yr
- - - $784
06 2.7135: Install occupancy sensors $1,179 $1,380 $923
19,930
kWh
$256
-
kW-mo/yr
- - - -
07 2.2511: Insulate bare equipment $784 $3,820 $784
89,683
kWh
- - - - -
08 2.6232: Install set-back timers $692 $1,050 - - $692
-
MMBtu
- - -
09 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $225 $161 $136
1,172
kWh
$89
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $48,070 $13,753 $8,275
361,079
kWh
$2,335
-
kW-mo/yr
$692
-
MMBtu
$7,077
-
lb
$28,907 $784
TOTAL IMPLEMENTED $32,247 $3,937 $2,736
165,592
kWh
$604
-
kW-mo/yr
- - $28,907 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs