ITAC Assessment: OK0547
ITAC logo
ITAC Assessment: OK0547
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Glass and Wood Fixtures
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 800
Plant Area 360,000
ft2
Annual Production 1,500
units
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,690 5,480,950
kWh
Electricity Demand $143,447 20,263
kW-mo/yr
Electricity Fees $7,022 -
Natural Gas $64,093 18,562
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,199 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.6232: Install set-back timers $400 $100 n/a - - $400
-
MMBtu
- -
02 2.4221: Install compressor air intakes in coolest locations $2,951 $4,900 n/a $2,951
58,617
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,865 $9,005 n/a $7,625
150,938
kWh
$240
-
kW-mo/yr
- - -
04 2.7124: Make a practice of turning off lights when not needed $151 - n/a $151
2,931
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $803 $1,000 n/a $599
8,206
kWh
- - - $204
06 4.452: Eliminate shift $9,629 $4,944 n/a $(-645.0)
(-12,603)
kWh
- - - $10,274
07 3.5212: Regrind, reuse, or sell scrap plastic parts $1,400 $4,000 n/a - - - $7,400
-
lb
$(-6,000.0)
TOTAL RECOMMENDED $23,199 $23,949 $10,681
208,089
kWh
$240
-
kW-mo/yr
$400
-
MMBtu
$7,400
-
lb
$4,478
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs