ITAC Assessment: OK0513
ITAC logo
ITAC Assessment: OK0513
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Wallboard Paper
NAICS
n/a
SIC 2631: Paperboard Mills
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 250,000
ft2
Annual Production 104,400
ton
Production Hrs. Annual 8,520
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $765,758 42,732,123
kWh
Electricity Fees $528,797 -
Natural Gas $1,665,257 1,697,939
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $820,674 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $76,528

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,003 $1,048 $589
30,774
kWh
$414
-
kW-mo/yr
- - -
02 2.2136: Install / repair insulation on steam lines $1,233 $343 - - $1,233
-
MMBtu
- -
03 2.2135: Repair and eliminate steam leaks $27,432 $3,300 - - $27,432
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,204 $5,551 $559
31,067
kWh
$645
-
kW-mo/yr
- - -
05 2.6232: Install set-back timers $331 $126 - - $331
-
MMBtu
- -
06 2.6218: Turn off equipment when not in use $3,859 - $1,099
61,254
kWh
$2,760
-
kW-mo/yr
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,226 $9,259 $5,262
293,669
kWh
$3,964
-
kW-mo/yr
- - -
08 3.5131: Recycle white water $729,526 $4,000,000 - - - $729,526
-
Tgal
-
09 4.423: Move product using mechanical means $46,860 $72,000 - - - - $46,860
TOTAL RECOMMENDED $820,674 $4,091,627 $7,509
416,764
kWh
$7,783
-
kW-mo/yr
$28,996
-
MMBtu
$729,526
-
Tgal
$46,860
TOTAL IMPLEMENTED $76,528 $76,691 $589
30,774
kWh
$414
-
kW-mo/yr
$28,665
-
MMBtu
- $46,860
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs