ITAC Assessment: OK0509
ITAC logo
ITAC Assessment: OK0509
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Pipe fittings and flanges
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 870,000
ft2
Annual Production 9,600
ton
Production Hrs. Annual 5,200
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $178,078 3,804,807
kWh
Electricity Demand $768 9,290
kW-mo/yr
Natural Gas $377,203 157,737
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,650 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,636

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings
01 2.1231: Establish burner maintenance schedule for boilers $1,243 - - $1,243
-
MMBtu
- -
02 2.1122: Re-size charging openings or add a movable door on equipment $14,966 $18,000 - $11,066
-
MMBtu
- $3,900
03 2.2414: Use waste heat from hot flue gases to preheat $2,414 $9,615 - $2,414
-
MMBtu
- -
04 2.2437: Recover waste heat from equipment $2,419 $855 - $2,419
-
MMBtu
- -
05 2.6218: Turn off equipment when not in use $470 $460 $23
879
kWh
$447
-
MMBtu
- -
06 2.7261: Install timers and/or thermostats $538 $248 - $538
-
MMBtu
- -
07 3.8143: Recycle cleaning solvent and reuse $600 $6,901 - - $600
-
gal
-
TOTAL RECOMMENDED $22,650 $36,079 $23
879
kWh
$18,127
-
MMBtu
$600
-
gal
$3,900
TOTAL IMPLEMENTED $19,636 $19,563 $23
879
kWh
$15,713
-
MMBtu
- $3,900
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs