ITAC Assessment: MA0341
ITAC logo
ITAC Assessment: MA0341
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Printings and lithographies
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 42
Plant Area 36,900
ft2
Annual Production 12,000
pieces
Production Hrs. Annual 3,172
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,114 976,846
kWh
Natural Gas $28,239 3,260
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,706 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,176

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8123: Pay utility bills on time $1,707 - - - $1,707
02 2.7135: Install occupancy sensors $1,207 $1,440 $1,207
13,775
kWh
- -
03 2.8112: Combine utility meters $1,091 $200 - - $1,091
04 2.4231: Reduce the pressure of compressed air to the minimum required $721 - $721
5,862
kWh
- -
05 2.7224: Reduce space conditioning during non-working hours $511 $711 - $511
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $469 $400 - $469
-
MMBtu
-
TOTAL RECOMMENDED $5,706 $2,751 $1,928
19,637
kWh
$980
-
MMBtu
$2,798
TOTAL IMPLEMENTED $2,176 $400 - $469
-
MMBtu
$1,707
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs