Assessment Year | 2024 |
---|---|
Principal Product | corn flour |
NAICS | 311211: Flour Milling |
SIC | 2041: Flour and Other Grain Mill Products |
Sales Range | $50 M to 100M |
# of Employees | 69 |
Plant Area |
108,878
ft2
|
Annual Production | 300,000,000
lb
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,418,100 | 21,294,949 |
kWh
|
$0.067 |
Electricity Demand | $107,033 | 35,405 |
kW-mo/yr
|
$3.02 |
Natural Gas | $58,573 | 2,389 |
MMBtu
|
$24.52 |
TOTAL YEARLY COSTS | $1,583,706 | |||
RECOMMENDED SAVINGS* | $33,522 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,013 | $1,000 |
$3,729
56,505
kWh
|
$284
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $15,634 | $22,593 |
$15,634
236,883
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,031 | $3,943 |
$393
5,960
kWh
|
$108
-
kW-mo/yr
|
$530 | |
04 | 2.7135: Install occupancy sensors | $6,915 | $4,560 |
$6,915
104,774
kWh
|
- | - | |
05 | 2.6127: Maintain air filters by cleaning or replacement | $1,132 | $200 |
$1,132
17,153
kWh
|
- | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $3,914 | $12,624 |
$2,783
42,168
kWh
|
$1,131
-
kW-mo/yr
|
- | |
07 | 2.2511: Insulate bare equipment | $883 | $418 |
$883
13,385
kWh
|
- | - | |
TOTAL RECOMMENDED | $33,522 | $45,338 |
$31,469
476,828
kWh
|
$1,523
-
kW-mo/yr
|
$530 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs