ITAC Assessment: KU0392
ITAC logo
ITAC Assessment: KU0392
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product JANITORIAL SUPPLIES
NAICS
n/a
SIC 2842: Specialty Cleaning, Polishing, and Sanitation Preparations
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 4,000,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,589 1,669,109
kWh
Natural Gas $88,548 20,593
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,257 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $10,912 $1,720 - $10,912
-
MMBtu
-
02 3.4115: Recover and reuse cooling water $7,703 $6,000 $(-797.0)
(-13,775)
kWh
- $8,500
03 2.7135: Install occupancy sensors $5,749 $6,500 $5,749
99,355
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $141 - $86
1,465
kWh
- $55
05 2.2614: Use cooling tower or economizer to replace chiller cooling $1,137 $2,500 $1,137
19,637
kWh
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,914 $300 - $1,914
-
MMBtu
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $701 $150 - $701
-
MMBtu
-
TOTAL RECOMMENDED $28,257 $17,170 $6,175
106,682
kWh
$13,527
-
MMBtu
$8,555
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs