Assessment Year | 1996 |
---|---|
Principal Product | Wheat Flour |
NAICS |
n/a
|
SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
Sales Range | $50 M to 100M |
# of Employees | 70 |
Plant Area |
249,840
ft2
|
Annual Production | 200,000
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $518,553 | 21,936,108 |
kWh
|
$0.024 |
Electricity Demand | $331,499 | 43,100 |
kW-mo/yr
|
$7.69 |
Electricity Fees | $3,228 | - |
|
- |
Natural Gas | $7,228 | 1,499 |
MMBtu
|
$4.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,944 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,282 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.5217: Reuse / recycle/ sell paper products | $800 | - | - | - | - |
$800
-
lb
|
|
02 | 3.4116: Meter recycled water (to reduce sewer charges) | $18,853 | - | - | - |
$18,853
-
Tgal
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,725 | $8,750 |
$3,784
157,679
kWh
|
$1,941
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,744 | $390 |
$7,744
322,685
kWh
|
- | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $2,538 | $7,860 |
$2,538
105,803
kWh
|
- | - | - | |
06 | 2.7135: Install occupancy sensors | $873 | $1,890 |
$873
36,342
kWh
|
- | - | - | |
07 | 2.6231: Utilize controls to operate equipment only when needed | $411 | $2,244 |
$411
17,292
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $36,944 | $21,134 |
$15,350
639,801
kWh
|
$1,941
-
kW-mo/yr
|
$18,853
-
Tgal
|
$800
-
lb
|
||
TOTAL IMPLEMENTED | $10,282 | $8,250 |
$10,282
428,488
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs