ITAC Assessment: SD0308
ITAC logo
ITAC Assessment: SD0308
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Milk and hay
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 871,000
ft2
Annual Production 12,000
Tgal
Production Hrs. Annual 7,200
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $466,787 5,485,431
kWh
Electricity Demand $40,436 14,494
kW-mo/yr
Electricity Fees $192 -
Natural Gas $44,508 10,038
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $273,230 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $168,158 $56,000 $157,950
1,856,046
kWh
$10,208
-
kW-mo/yr
-
02 2.7311: Ventilation system to shut off when room is not in use $7,470 $6,000 $5,936
69,751
kWh
$1,534
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,224 $5,000 $3,968
46,633
kWh
$256
-
kW-mo/yr
-
04 2.7311: Ventilation system to shut off when room is not in use $1,853 - $1,295
15,218
kWh
$558
-
kW-mo/yr
-
05 2.7134: Use photocell controls $525 $500 $446
5,242
kWh
$79
-
kW-mo/yr
-
06 3.2176: Increase use of automation $91,000 $75,000 - - $91,000
TOTAL RECOMMENDED $273,230 $142,500 $169,595
1,992,890
kWh
$12,635
-
kW-mo/yr
$91,000
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs