Assessment Year | 1995 |
---|---|
Principal Product | Rod pumps |
NAICS |
n/a
|
SIC | 3448: Prefabricated Metal Buildings and Components |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
160,000
ft2
|
Annual Production | 36,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $161,955 | 3,118,992 |
kWh
|
$0.052 |
Natural Gas | $39,601 | 12,547 |
MMBtu
|
$3.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,278 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,103 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (non-haz) Savings |
---|---|---|---|---|---|---|
01 | 2.3137: Use power during off-peak periods | $3,319 | - |
$3,319
-
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,650 | $90 |
$2,650
50,996
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $900 | $655 |
$900
17,292
kWh
|
- | |
04 | 2.6232: Install set-back timers | $553 | $200 |
$553
10,551
kWh
|
- | |
05 | 3.1191: Change procedures / equipment / operating conditions | $10,856 | $36,000 | - |
$10,856
-
gal
|
|
TOTAL RECOMMENDED | $18,278 | $36,945 |
$7,422
78,839
kWh
|
$10,856
-
gal
|
||
TOTAL IMPLEMENTED | $4,103 | $945 |
$4,103
78,839
kWh
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs