ITAC Assessment: OK0476
ITAC logo
ITAC Assessment: OK0476
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Rod pumps
NAICS
n/a
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 160,000
ft2
Annual Production 36,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,955 3,118,992
kWh
Natural Gas $39,601 12,547
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,278 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,103

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (non-haz) Savings
01 2.3137: Use power during off-peak periods $3,319 - $3,319
-
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,650 $90 $2,650
50,996
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $900 $655 $900
17,292
kWh
-
04 2.6232: Install set-back timers $553 $200 $553
10,551
kWh
-
05 3.1191: Change procedures / equipment / operating conditions $10,856 $36,000 - $10,856
-
gal
TOTAL RECOMMENDED $18,278 $36,945 $7,422
78,839
kWh
$10,856
-
gal
TOTAL IMPLEMENTED $4,103 $945 $4,103
78,839
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs