| Assessment Year | 1993 |
|---|---|
| Principal Product | Elevator Cabs and related products |
| NAICS |
n/a
|
| SIC | 3534: Elevators and Moving Stairways |
| Sales Range | $5 M to 10M |
| # of Employees | 94 |
| Plant Area |
60,700
ft2
|
| Annual Production | 1,000
pieces
|
| Production Hrs. Annual | 4,590
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $39,689 | 747,069 |
kWh
|
$0.053 |
| Natural Gas | $23,066 | 5,599 |
MMBtu
|
$4.12 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $4,866 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,137 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,312 | $3,809 |
$1,312
19,343
kWh
|
- | |
| 02 | 2.1221: Replace obsolete burners with more efficient ones | $1,494 | $898 | - |
$1,494
-
MMBtu
|
|
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $864 | - |
$864
20,809
kWh
|
- | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $779 | $1,600 | - |
$779
-
MMBtu
|
|
| 05 | 2.2511: Insulate bare equipment | $238 | $527 | - |
$238
-
MMBtu
|
|
| 06 | 2.4221: Install compressor air intakes in coolest locations | $179 | $217 |
$179
3,517
kWh
|
- | |
| TOTAL RECOMMENDED | $4,866 | $7,051 |
$2,355
43,669
kWh
|
$2,511
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $3,137 | $2,498 |
$864
20,809
kWh
|
$2,273
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs