ITAC Assessment: OK0396
ITAC logo
ITAC Assessment: OK0396
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Electronic Pressure Gauges and Vario
NAICS
n/a
SIC 3824: Totalizing Fluid Meters and Counting Devices
Sales Range $1
M
to 5
M
# of Employees 37
Plant Area 5,000
ft2
Annual Production 24,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,815 476,846
kWh
Natural Gas $3,244 637
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,432 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,768

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $3,199 $8,100 $3,199
39,273
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,139 $80 $1,139
32,239
kWh
-
03 2.6232: Install set-back timers $1,153 $570 - $1,153
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $904 $270 $904
11,137
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $286 - $286
4,689
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $511 - $511
4,396
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $240 $897 $240
6,741
kWh
-
TOTAL RECOMMENDED $7,432 $9,917 $6,279
98,475
kWh
$1,153
-
MMBtu
TOTAL IMPLEMENTED $5,768 $9,347 $5,768
94,079
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs