ITAC Assessment: OK0376
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product TRAILERS, HORSE & CATTLE
NAICS
n/a
SIC 3799: Transportation Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 1,820
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,753 1,138,042
kWh
LPG $8,131 1,007
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,879 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,709

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,222 $3,222 $3,372
64,478
kWh
- $(-150.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $782 $782 $1,017
19,343
kWh
- $(-235.0)
03 2.7261: Install timers and/or thermostats $1,133 $1,133 $1,133
21,688
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $777 $777 $777
14,947
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $388 $388 $388
7,327
kWh
- -
06 2.6214: Shut off pilots in standby equipment $388 $561 - $388
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $189 $554 $189
3,517
kWh
- -
TOTAL RECOMMENDED $6,879 $7,417 $6,876
131,300
kWh
$388
-
MMBtu
$(-385.0)
TOTAL IMPLEMENTED $5,709 $6,074 $5,859
111,957
kWh
- $(-150.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs