ITAC Assessment: OK0366
ITAC logo
ITAC Assessment: OK0366
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product WOOD STAINS,COATINGS,ETC
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area
n/a
Annual Production 1,020
Tgal
Production Hrs. Annual 3,120
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,723 411,489
kWh
Natural Gas $3,856 2,476
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,951 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,951

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $994 $441 $1,402
21,395
kWh
$(-309.0)
-
MMBtu
$(-99.0)
02 2.4133: Use most efficient type of electric motors $132 $362 $132
2,052
kWh
- -
03 2.2511: Insulate bare equipment $395 $750 - $395
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $738 $631 $738
11,430
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $318 - $318
4,982
kWh
- -
06 2.7261: Install timers and/or thermostats $395 $300 - $395
-
MMBtu
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,979 $6,325 $1,979
30,188
kWh
- -
TOTAL RECOMMENDED $4,951 $8,809 $4,569
70,047
kWh
$481
-
MMBtu
$(-99.0)
TOTAL IMPLEMENTED $4,951 $8,809 $4,569
70,047
kWh
$481
-
MMBtu
$(-99.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs