| Assessment Year | 1992 |
|---|---|
| Principal Product | WOOD STAINS,COATINGS,ETC |
| NAICS |
n/a
|
| SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
| Sales Range | $10 M to 50M |
| # of Employees | 60 |
| Plant Area |
n/a
|
| Annual Production | 1,020
Tgal
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $30,723 | 411,489 |
kWh
|
$0.075 |
| Natural Gas | $3,856 | 2,476 |
MMBtu
|
$1.56 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $4,951 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,951 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $994 | $441 |
$1,402
21,395
kWh
|
$(-309.0)
-
MMBtu
|
$(-99.0) | |
| 02 | 2.4133: Use most efficient type of electric motors | $132 | $362 |
$132
2,052
kWh
|
- | - | |
| 03 | 2.2511: Insulate bare equipment | $395 | $750 | - |
$395
-
MMBtu
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $738 | $631 |
$738
11,430
kWh
|
- | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $318 | - |
$318
4,982
kWh
|
- | - | |
| 06 | 2.7261: Install timers and/or thermostats | $395 | $300 | - |
$395
-
MMBtu
|
- | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,979 | $6,325 |
$1,979
30,188
kWh
|
- | - | |
| TOTAL RECOMMENDED | $4,951 | $8,809 |
$4,569
70,047
kWh
|
$481
-
MMBtu
|
$(-99.0) | ||
| TOTAL IMPLEMENTED | $4,951 | $8,809 |
$4,569
70,047
kWh
|
$481
-
MMBtu
|
$(-99.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs