ITAC Assessment: UM0121
ITAC logo
ITAC Assessment: UM0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product superabrasive electroplated tooling
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 10,400
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,569 312,720
kWh
Electricity Fees $982 -
Natural Gas $3,169 728
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,339 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,322

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,850 $2,048 $1,850
18,464
kWh
- - - -
02 2.4221: Install compressor air intakes in coolest locations $511 $1,000 $511
5,275
kWh
- - - -
03 2.2437: Recover waste heat from equipment $761 $990 $761
51,290
kWh
- - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $12,085 $6,000 $14,712
141,559
kWh
$(-2,627.0)
-
MMBtu
- - -
05 3.3131: Use evaporation to concentrate material $8,359 $12,000 - - $8,359
-
Tgal
- -
06 3.3122: Use filtration, centrifuging to remove contaminants $12,017 $11,000 - - - $12,017
-
gal
-
07 4.125: $1,756 $3,350 - - - - $1,756
TOTAL RECOMMENDED $37,339 $36,388 $17,834
216,588
kWh
$(-2,627.0)
-
MMBtu
$8,359
-
Tgal
$12,017
-
gal
$1,756
TOTAL IMPLEMENTED $25,322 $25,388 $17,834
216,588
kWh
$(-2,627.0)
-
MMBtu
$8,359
-
Tgal
- $1,756
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings