| Assessment Year | 1991 |
|---|---|
| Principal Product | TRACTORS, TRAILERS |
| NAICS |
n/a
|
| SIC | 3531: Construction Machinery and Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 380 |
| Plant Area |
n/a
|
| Annual Production | 7,800
pieces
|
| Production Hrs. Annual | 3,840
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $489,589 | 7,065,651 |
kWh
|
$0.069 |
| Natural Gas | $97,528 | 32,437 |
MMBtu
|
$3.01 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,435 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $307 | $403 | - |
$307
-
MMBtu
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,285 | - |
$1,219
17,585
kWh
|
- | $66 | |
| 03 | 2.7261: Install timers and/or thermostats | $3,012 | $1,050 | - |
$3,012
-
MMBtu
|
- | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $10,521 | $13,526 |
$(-164.0)
(-4,103)
kWh
|
$10,685
-
MMBtu
|
- | |
| 05 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,198 | $107 |
$1,198
17,292
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $756 | - |
$900
12,896
kWh
|
- | $(-144.0) | |
| 07 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $2,356 | $4,600 |
$2,356
33,998
kWh
|
- | - | |
| TOTAL RECOMMENDED | $19,435 | $19,686 |
$5,509
77,668
kWh
|
$14,004
-
MMBtu
|
$(-78.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs