Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product TRACTORS, TRAILERS
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 380
Plant Area
n/a
Annual Production 7,800
pieces
Production Hrs. Annual 3,840
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $489,589 7,065,651
kWh
Natural Gas $97,528 32,437
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,435 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $307 $403 - $307
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,285 - $1,219
17,585
kWh
- $66
03 2.7261: Install timers and/or thermostats $3,012 $1,050 - $3,012
-
MMBtu
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $10,521 $13,526 $(-164.0)
(-4,103)
kWh
$10,685
-
MMBtu
-
05 2.6212: Turn off equipment during breaks, reduce operating time $1,198 $107 $1,198
17,292
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $756 - $900
12,896
kWh
- $(-144.0)
07 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $2,356 $4,600 $2,356
33,998
kWh
- -
TOTAL RECOMMENDED $19,435 $19,686 $5,509
77,668
kWh
$14,004
-
MMBtu
$(-78.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs