ITAC Assessment: OK0335
ITAC logo
ITAC Assessment: OK0335
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product REBUILT AIRCRAFT ENGINES
NAICS
n/a
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area
n/a
Annual Production 300
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,508 237,691
kWh
Natural Gas $2,722 553
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,346 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,346

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,200 - $1,260
21,395
kWh
- $(-60.0)
02 2.7261: Install timers and/or thermostats $1,787 $1,500 $812
9,672
kWh
$975
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $197 $78 $197
3,224
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $162 $395 $162
2,638
kWh
- -
TOTAL RECOMMENDED $3,346 $1,973 $2,431
36,929
kWh
$975
-
MMBtu
$(-60.0)
TOTAL IMPLEMENTED $3,346 $1,973 $2,431
36,929
kWh
$975
-
MMBtu
$(-60.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs