ITAC Assessment: MZ0171
ITAC logo
ITAC Assessment: MZ0171
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product plastic cards and holders
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 20,000
ft2
Annual Production 350,000,000
pieces
Production Hrs. Annual 5,950
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,081 1,120,728
kWh
Electricity Demand $16,512 5,711
kW-mo/yr
Natural Gas $4,464 427
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,469 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7229: Air condition only space necessary $1,588 - - - $1,588
-
MMBtu
02 2.7221: Lower temperature during the winter season and vice-versa $8,781 - $7,739
89,343
kWh
$645
-
kW-mo/yr
$397
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,759 $3,900 $1,649
19,040
kWh
$110
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $2,783 $880 $2,783
32,125
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,558 $870 $2,396
27,659
kWh
$162
-
kW-mo/yr
-
TOTAL RECOMMENDED $17,469 $5,650 $14,567
168,167
kWh
$917
-
kW-mo/yr
$1,985
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs