ITAC Assessment: UM0019
ITAC logo
ITAC Assessment: UM0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Automotive wheels
NAICS
n/a
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 562,496
ft2
Annual Production 3,500,000
pieces
Production Hrs. Annual 5,720
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $980,623 18,235,346
kWh
Natural Gas $1,105,108 401,844
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $97,611 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $7,344 $12,265 n/a $7,344
135,991
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $29,150 $57,583 n/a $29,150
540,152
kWh
-
03 2.3212: Optimize plant power factor $48,220 $67,860 n/a $48,220
-
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $558 $585 n/a - $558
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $4,452 - n/a - $4,452
-
MMBtu
06 2.2511: Insulate bare equipment $7,887 $3,468 n/a - $7,887
-
MMBtu
TOTAL RECOMMENDED $97,611 $141,761 $84,714
676,143
kWh
$12,897
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs