ITAC Assessment: OK0332
ITAC logo
ITAC Assessment: OK0332
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product HEAT EXCHANGERS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area
n/a
Annual Production 300
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $244,645 5,961,899
kWh
Natural Gas $118,814 44,121
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,175 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,277

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $1,937 $900 - $1,937
-
MMBtu
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,898 - $5,898
-
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $98 $102 $98
1,758
kWh
- -
04 2.2437: Recover waste heat from equipment $7,747 $1,641 - $7,747
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,085 - $2,525
90,270
kWh
- $(-440.0)
06 2.4221: Install compressor air intakes in coolest locations $1,410 $1,070 $1,410
38,687
kWh
- -
TOTAL RECOMMENDED $19,175 $3,713 $9,931
130,715
kWh
$9,684
-
MMBtu
$(-440.0)
TOTAL IMPLEMENTED $13,277 $3,713 $4,033
130,715
kWh
$9,684
-
MMBtu
$(-440.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs