| Assessment Year | 1990 |
|---|---|
| Principal Product | HEAT EXCHANGERS |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $50 M to 100M |
| # of Employees | 300 |
| Plant Area |
n/a
|
| Annual Production | 300
pieces
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $244,645 | 5,961,899 |
kWh
|
$0.041 |
| Natural Gas | $118,814 | 44,121 |
MMBtu
|
$2.69 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,175 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $13,277 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $1,937 | $900 | - |
$1,937
-
MMBtu
|
- | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,898 | - |
$5,898
-
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $98 | $102 |
$98
1,758
kWh
|
- | - | |
| 04 | 2.2437: Recover waste heat from equipment | $7,747 | $1,641 | - |
$7,747
-
MMBtu
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,085 | - |
$2,525
90,270
kWh
|
- | $(-440.0) | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $1,410 | $1,070 |
$1,410
38,687
kWh
|
- | - | |
| TOTAL RECOMMENDED | $19,175 | $3,713 |
$9,931
130,715
kWh
|
$9,684
-
MMBtu
|
$(-440.0) | ||
| TOTAL IMPLEMENTED | $13,277 | $3,713 |
$4,033
130,715
kWh
|
$9,684
-
MMBtu
|
$(-440.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs