ITAC Assessment: HO0219
ITAC logo
ITAC Assessment: HO0219
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Paper Industry Machinery
NAICS
n/a
SIC 3554: Paper Industries Machinery
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 200,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,846 4,842,321
kWh
Electricity Demand $149,847 27,283
kW-mo/yr
Electricity Fees $96,493 -
Natural Gas $100,238 24,510
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,071 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,041

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,633 $18,330 $3,996
127,198
kWh
$2,637
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $2,714 $5,000 $2,714
86,460
kWh
- -
03 2.7134: Use photocell controls $3,386 $1,515 $3,386
107,855
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $1,271 $1,500 $743
23,740
kWh
$528
-
kW-mo/yr
-
05 2.4226: Use / purchase optimum sized compressor $7,030 $9,000 $7,030
37,222
kWh
- -
06 2.7243: Improve air circulation with destratification fans / other methods $13,935 $8,000 - - $13,935
-
MMBtu
07 2.2136: Install / repair insulation on steam lines $3,102 $4,641 - - $3,102
-
MMBtu
TOTAL RECOMMENDED $38,071 $47,986 $17,869
382,475
kWh
$3,165
-
kW-mo/yr
$17,037
-
MMBtu
TOTAL IMPLEMENTED $31,041 $38,986 $10,839
345,253
kWh
$3,165
-
kW-mo/yr
$17,037
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs