ITAC Assessment: DS0161
ITAC logo
ITAC Assessment: DS0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Cutting Tool Manufacture and Repair
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 23,000
ft2
Annual Production 33,480
pieces
Production Hrs. Annual 5,408
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,972 572,098
kWh
Electricity Demand $10,884 1,932
kW-mo/yr
Electricity Fees $2,004 -
Natural Gas $7,465 1,396
MMBtu
LPG $207 17
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,248 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,756

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,330 $7,355 $1,740
41,325
kWh
$590
-
kW-mo/yr
- - - -
02 2.3212: Optimize plant power factor $1,323 $1,050 - - $1,323 - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,603 $180 $1,200
28,722
kWh
$403
-
kW-mo/yr
- - - -
04 2.7261: Install timers and/or thermostats $1,142 $2,040 - - - $1,142
-
MMBtu
- -
05 2.2437: Recover waste heat from equipment $758 $1,130 - - - $758
-
MMBtu
- -
06 3.6124: Burn waste oil for heat $1,329 $3,495 $(-74.0)
(-1,758)
kWh
- - $494
-
MMBtu
$1,260
-
gal
$(-351.0)
07 4.441: Install automatic packing equipment $1,560 $3,000 - - - - - $1,560
08 4.611: Begin a practice of predictive / preventative maintenance $1,203 - - - - - - $1,203
TOTAL RECOMMENDED $11,248 $18,250 $2,866
68,289
kWh
$993
-
kW-mo/yr
$1,323 $2,394
-
MMBtu
$1,260
-
gal
$2,412
TOTAL IMPLEMENTED $6,756 $11,575 $1,740
41,325
kWh
$590
-
kW-mo/yr
$1,323 $1,900
-
MMBtu
- $1,203
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs